American Flooring Installations · Selected work

Good floors start
below the surface.

Commercial spaces. Real project photography. See the preparation, coordination and installation behind the finished floor.

Schools · Workplaces · Banks · CampusesBased in Redding, serving Central and Northern California—from Fresno to the Oregon border, including the I-5 corridor and Bay Area.
Materials, preparation and installation planned around the space.
Rohnert Park bank renovation: finished lobby carpet and adjacent tile walkway.
Rohnert Park bank renovation · Finished lobby flooring

From the substrate up

What you don’t see
matters.

A finished floor is only part of the story. Existing flooring, bond conditions, substrate flatness and moisture requirements all shape the installation plan. Our project photos show that work in progress, before the new flooring covers it.

Sunnyvale medical technology facility lab: exposed substrate during demolition and preparation.
01 / Expose the conditionsSunnyvale · Substrate exposed during removal and preparation.
Rohnert Park bank renovation: straightedge used during substrate preparation.
02 / Check the surfaceRohnert Park · Straightedge check during floor preparation.
Sunnyvale laboratory floor following surface preparation, before sheet vinyl installation.
03 / Prepare for the systemSunnyvale · Prepared lab floor during the project.

01 / Workplace & laboratory · Sunnyvale

Medical technology
facility.

Extensive removal, moisture and bond evaluation, mitigation and flooring installation at a facility supporting robotic-assisted surgical technology. AFI managed substrate challenges, static-dissipative flooring coordination and work around lifted cubicles.

Read the project story

AFI worked with Source One, general contractor Barron Builders, the facility electrical contractor and a Schönox technical representative.

Sunnyvale medical technology facility workplace: completed flooring among office workstations.
Completed office flooring among the existing workstations.
Bond-test setup in progress over different primer and preparation combinations.
Early-phase sheet-vinyl bond-test panels over different primer and preparation systems.
Installer placing grounding strips over the prepared substrate for static-dissipative flooring.
Installer placing grounding strips over the prepared floor for static-dissipative flooring.
Moisture-treatment phase along an existing workstation aisle.
Moisture-treatment phase along the workstation aisle.

02 / Bank of America · Central & Northern California

Bank renovations

AFI partners with Source One to install carpet and resilient flooring at Bank of America locations across Central and Northern California. After-hours work, rapid diagnosis of substrate issues and careful logistics keep the installation aligned with normal banking operations.

Read the project story
Rohnert Park bank renovation: finished lobby carpet and adjacent tile walkway.
Finished lobby carpet and adjacent tile walkway.
Rohnert Park bank renovation: straightedge used during substrate preparation.
Checking the prepared substrate with a straightedge.
Rohnert Park bank renovation: flooring installation and seam preparation phase.
Installation phase in the bank work area.
Rohnert Park bank renovation: finished carpet in the corridor.
Finished carpet through the corridor.

03 / Education · Northern California

Classrooms,
ready for learning.

Flooring choices for real school spaces, maintenance needs and budgets. These Catholic school projects show installed classroom flooring and the finishing details that bring the room together.

ClassroomsCommercial flooringCampus planning
Explore school flooring
Catholic school classroom · Redding.
Catholic school classroom · Redding.
St Thomas the Apostle school: wide view of installed classroom flooring.
St. Thomas the Apostle · Installed classroom flooring in Oroville.
Redding classroom · Patterned commercial flooring and wall base.
Redding classroom · Patterned commercial flooring and wall base.

04 / Higher education · Redding

Simpson University

AFI’s work at Simpson University includes the entire upstairs library, the cafeteria, numerous dorm rooms and classrooms. It is a broader campus story: different spaces, different uses and a consistent focus on preparation and installation.

Read the campus story

Photographs show the upstairs library, mezzanine and carpeted stairway at Simpson University.

Simpson University upstairs library: completed patterned commercial carpet among the shelving and study spaces.
Simpson University · Completed upstairs library flooring.
Simpson University upstairs library: finished carpet beside the mezzanine railing.
Simpson University · Library carpet along the mezzanine railing.
Simpson University library: completed carpeted staircase and adjoining floor transition.
Simpson University · Completed carpeted library stairway.

Plan your next project

Your space.
Your schedule.
A better floor.

Work directly with AFI to discuss commercial flooring materials, preparation, installation and local stock options for your school or business.

(530) 364-0156